Foshan tomick Industrial Automation Co., Ltd Welcome for you!

Foshan tomick Industrial Automation Co., Ltd

Main products:Cartoner, vertical packer

Foshan tomick Industrial Automation Co., Ltd

Service hotline

177-2562-9029
0757-86611276

Contact us

Contact person: He Gong

Tel: 0757-86611276

Mobile phone: 18719219113 17725629029

Fax: 0757-86611536

Email: tmkpack@163.com

Address: No.2, Bojin Road, hardware industrial

zone, Danzao Town, Nanhai District, Foshan City

Your current location is:Home>>About us>>News>>Industry information

Analysis on the operation of the whole carton loading machine

Release time:2020-09-17 17:50:43  Number of visits: 788

Analysis on the operation of the whole carton loading machine

纸盒装盒机整机运行动作解析.jpg

The components of the core parts of the carton loading machine are as follows: 2 sets of tongue seal swing block, box pressing, box walking chain, upper cover sealing box, swinging sealing box, clamping belt and removing device.

(1) The sealing tongue swing block mechanism is the whole movement (continuous movement) of stainless steel plate bending into a right angle to flatten the back side of the carton through the transmission mechanism.

(2) Key points of tongue sealing mechanism: time, height, distance, back plate length, carton position (middle position), carton pressing height, carton chain.

(3) The key points of the accessories of the carton loading machine are: to ensure the smooth movement of the carton in the carton chain; to ensure the overall sealing effect; the middle strip is basically in the middle of the carton, and the height is based on the height of the carton, which can not be too low or too high; avoid dragging when clamping the carton. It can't be too tight or too loose

(4) The whole machine running chain of carton loading machine.

1. Chain composition of the whole machine: there are four chains, each chain is equipped with an assembly blackboard, and every two chains form a group. The four chains form a distance with the same size as the carton, which is used to fix the carton. The carton does not move on the chain. The carton moves through the chain. The whole chain is driven by two driving gears and passive gears. In addition, one chain in each group is fixed and the other is adjustable to adjust the width of the carton.

2. Holding the carton to make the carton move towards the fixed direction and the reference points of all motor control;

Related parts: suction cup sucking action, carton lowering action and position, folding tongue, covering carton, clamping carton belt, removing device, etc;

1. The key points of swing sealing mechanism swing sealing: Carton position (middle), synchronization (time and position), carton guide strip, bending plate (carton cover), height and distance of pallet (dragging the lower opening of carton), two groups of carton inserting plates (height and distance), tightness of carton pressing.

2. Movement principle: the sealing stainless steel plate moves in concentric circles, so that the stainless steel insert plate on the sprocket can seal the carton cover.


Contact us

Contact person: He Gong

Tel: 0757-86611276

Mobile phone: 18719219113 17725629029

Fax: 0757-86611536

Email: tmkpack@163.com

Address: No.2, Bojin Road, hardware industrial

zone, Danzao Town, Nanhai District, Foshan City

Foshan tomick Industrial Automation Co., Ltd

Scan QR code

Copyright © Foshan tomick Industrial Automation Co., Ltd Yue ICP Bei no.15055316 Sitemap XML Technical support: yijiantian

返回顶部